processing5185
Pages:
1HarlanHambright private msg quote post Address this user | ||
I'm not complaining, per se, but processing times with the Pro2 are certainly, shall we say, elongated. A 150 scan job went in at 2:30 pm and it's 10:00 with no results yet. I can easily sacrifice these wait times in deference to image quality (which is now outstanding for the most part) but geeze. | ||
Post 1 IP flag post |
Cleveland, OH |
CLE3D private msg quote post Address this user | |
Have the camera on order and waiting (im)patiently... | ||
Post 2 IP flag post |
Ghagendorf private msg quote post Address this user | ||
I had the same experience this week. About 9 hours to complete. When I looked at the scan in my spaces list the wheel just kept turning. Finally I clicked on the spinning and it opened the scan. I don't know if my timing was perfect with its completion or they have a glitch. | ||
Post 3 IP flag post |
WGAN Basic Member Las Vegas |
DaveFahrny private msg quote post Address this user | |
Yes the process time is quite a bit longer. I just processed a project with 170 scans. I put it into upload at 8:30 PM and it finished around 8:00 AM the next morning. I hope that faster processing is a project that Matterport is working on. | ||
Post 4 IP flag post |
Pages:
1This topic is archived. Start new topic?